Fetlar
Fetlar 0.5: what’s new

Exactly as written.

Read Word, Excel and PowerPoint files the way their authors see them. One program, offline, Arabic included.

Free for personal use. macOS on Apple Silicon and Intel; Windows and Linux are coming.

Converting 112 real Office files

Word, Excel and PowerPoint from statistics offices, central banks, governments, universities and companies. Four tools, one stopwatch. Shown at about 55× speed.

Time to convert all files

Peak memory

Fetlar converted all 112 files in 2.3 s using 447 MB of memory at peak. pandoc took 157.3 s and used 9.8 GB. MarkItDown took 232.2 s and used 1.9 GB. Docling took 386.2 s and used 7.2 GB.

Fetlar 0.5.0, pandoc 3.13, MarkItDown 0.1.9, Docling 2.154.0. MacBook Pro, Apple M5 (10 cores), 24 GB, macOS 27.3. Each tool ran alone. Python tools were timed warm, which favors them. How we measured1

167×1

faster than Docling

21×1

less memory than pandoc

98%1

of Excel text right

01

files it failed to read

~10 MB2

one program, nothing else to install

fetlar table_es1a.xlsx

Real files. Four tools.

Six public files, each opened by Fetlar, Docling, MarkItDown and pandoc. Excerpts are shortened for space and say so. Where Fetlar is wrong, it shows.

What the author sees

Fetlar

Partly right
|  |  | Total (All Sectors) |  |  |
| <br> |  | <br> |  |  |
| Fuel | Facility Type | September 2026 | September 2025 | Percentage Change |
| Net Generation (Thousand Megawatthours) |  |  |  |  |
| Coal | Utility Scale Facilities | 64,285 | 58,161 | 10.5% |
| Petroleum Liquids | Utility Scale Facilities | 999 | 918 | 8.8% |
| Petroleum Coke | Utility Scale Facilities | 665 | 369 | 80.1% |
| Natural Gas | Utility Scale Facilities | 176,757 | 168,278 | 5.0% |

Matches Excel: 64,285 with the thousands separator and 10.5% as a percentage; but empty header cells come out as a literal <br>, and the merged 'Total (All Sectors)' label sits only over the first of its three columns.

Docling

Partly right
| | | Total (All Sectors) | Total (All Sectors) | Total (All Sectors) |
| | | | | |
| Fuel | Facility Type | September 2026 | September 2025 | Percentage Change |
| Net Generation (Thousand Megawatthours) | Net Generation (Thousand Megawatthours) | Net Generation (Thousand Megawatthours) | Net Generation (Thousand Megawatthours) | Net Generation (Thousand Megawatthours) |
| Coal | Utility Scale Facilities | 64285 | 58161 | 10.5% |
| Petroleum Liquids | Utility Scale Facilities | 999 | 918 | 8.8% |
| Petroleum Coke | Utility Scale Facilities | 665 | 369 | 80.1% |
| Natural Gas | Utility Scale Facilities | 176757 | 168278 | 5.0% |

Percentages are right (10.5%), but thousands separators are dropped (64285 where Excel shows 64,285).

MarkItDown

Wrong
| NaN | NaN | Total (All Sectors) | NaN | NaN |
| \n | NaN | \n | NaN | NaN |
| Fuel | Facility Type | September 2026 | September 2025 | Percentage Change |
| Net Generation (Thousand Megawatthours) | NaN | NaN | NaN | NaN |
| Coal | Utility Scale Facilities | 64285 | 58161 | 0.105 |
| Petroleum Liquids | Utility Scale Facilities | 999 | 918 | 0.088 |
| Petroleum Coke | Utility Scale Facilities | 665 | 369 | 0.801 |
| Natural Gas | Utility Scale Facilities | 176757 | 168278 | 0.05 |

Shows 0.105 where Excel shows 10.5%, drops thousands separators (64285), and prints NaN and 'Unnamed' header cells.

pandoc

Not supported
Not supported: pandoc has no .xlsx reader (it exits with an error).

Cannot read .xlsx at all.

table_es1a.xlsx, U.S. Energy Information Administration (EIA), Electric Power Monthly, Table ES1.A. Source. License: US federal government work, public domain (17 U.S.C. 105); EIA Copyrights and Reuse page. Source: U.S. Energy Information Administration, Electric Power Monthly, Table ES1.A (September 2026 data, file downloaded 2026-11-29).

Columns beyond E are cut with a trailing pipe boundary. Docling's table padding (runs of spaces and dashes) is collapsed for display. Docling's very first rows repeat the merged title text in every column (not in this excerpt).

What the author sees: Sheet Table_ES1A, columns A-E (Fuel to Percentage Change), header rows plus Coal to Natural Gas. Columns F-O omitted from every excerpt for space.

Fetlar 0.5.0, Docling 2.154.0, MarkItDown 0.1.9, pandoc 3.13. Retrieved 2026-11-29. Default options, Markdown output. MarkItDown ran with lxml below 6, because the current lxml makes it fail on every .docx here. Excerpts are shortened for space, and each says what was cut.

fetlar reports/ -o out/

Numbers, with receipts.

Four tools, 112 real files, one laptop. Each chart says what ran, on what, and how. Word is a tie. On PowerPoint, Fetlar does not lead.

Total time

Seconds to convert all files. Shorter is better.

  • Fetlar2.3 s
  • pandoc157.3 s
  • MarkItDown232.2 s
  • Docling386.2 s
Fetlar 0.5.0, pandoc 3.13, MarkItDown 0.1.9, Docling 2.154.0. MacBook Pro, Apple M5 (10 cores), 24 GB, macOS 27.3. Each tool ran alone, one pass over 112 files. Python tools were timed warm, which favors them. How we measured

Peak memory

Highest memory used at any moment. Shorter is better.

  • Fetlar447 MB
  • pandoc9.8 GB
  • MarkItDown1.9 GB
  • Docling7.2 GB
Fetlar 0.5.0, pandoc 3.13, MarkItDown 0.1.9, Docling 2.154.0. MacBook Pro, Apple M5 (10 cores), 24 GB, macOS 27.3. Each tool ran alone, one pass over 112 files. Python tools were timed warm, which favors them. How we measured

Excel accuracy

Share of the text read right. Longer is better.

  • Fetlar98.4%
  • MarkItDown78.7%
  • Docling77.8%
  • pandoc76.9%

Word is a tie: 92.1% against 91.5% at best. Across all files, 94.5% against 88.2% for the next tool.

Fetlar 0.5.0, pandoc 3.13, MarkItDown 0.1.9, Docling 2.154.0. MacBook Pro, Apple M5 (10 cores), 24 GB, macOS 27.3. Each tool ran alone, one pass over 112 files. Python tools were timed warm, which favors them. How we measured

fetlar diff

Every change. Every cell.

Two versions in, every difference out: changed words, moved paragraphs, cell values and formulas. A new row doesn't throw off the rest. Then hand over a Word report.

$ fetlar diff contract-v1.docx contract-v2.docx --report changes.docx
contract-v1.docx → contract-v2.docx

3.2.1 The Supplier shall pay within 3045 days of the invoice date, with a late fee of 15%18%.

5.2 Notices must be sent in writing to the address on the cover page.

Moved Either party may end this agreement with sixty days' notice. Now 5.3

Budget!C215% 18%
Budget!C31,250.00 1,400.00
2 words1 moved2 cells

fetlar mcp

Give your agent the real file.

One command and Claude, Cursor or any MCP app can read, compare, write and search Office files on your computer, with tables, numbers and Arabic intact.

$ claude mcp add fetlar -- fetlar mcp

Setup for Claude Desktop, Cursor and Codex is in the agents guide.

fetlar mcp

tools/callcompare_office_files

{"old_path":"budget-v1.xlsx","new_path":"budget-v2.xlsx"}

Compared budget-v1.xlsx (old) with budget-v2.xlsx (new): 2 changes: 2 edited.

{"kind":"cell_changed","location":{"sheet":"Budget","cell":"B2","row":2,"column":2},"old":"1,250.00","new":"1,400.00"}
{"kind":"cell_changed","location":{"sheet":"Budget","cell":"C2","row":2,"column":3},"old":"15%","new":"18%"}

fetlar contract.docx

Right to left. Right the first time.

Arabic comes out in the order it was written. Never flipped, never broken into loose letters. Tables stay right to left. Search finds أحمد when you type احمد, and ٢٠٢٦ when you type 2026.

٣.٢.١ يلتزم المورد بتسليم البضاعة خلال ثلاثين يومًا

احمد finds أحمد2026 finds ٢٠٢٦٣.٢.١ stays ٣.٢.١

Offline.

No account, no cloud, no upload. Your files never leave your computer.

It writes, too.

Word, Excel and CSV from JSON. Fill your own templates and keep every style.

One program.

A command line and an MCP server. About 10 MB, nothing else to install.

Get started in three steps.

  1. Install

    Downloads open soon.

  2. Read a file

    $ fetlar report.docx
  3. Connect your agent

    $ fetlar mcp

Exactly
as written.

Read the docs

  1. Run of 2026-11-29 on 112 real Word, Excel and PowerPoint files from statistics offices, central banks, governments, universities and companies; all 112 scored. Docling failed on 4 files and pandoc on 1. MacBook Pro, Apple M5 (10 cores), 24 GB, macOS 27.3. Other work was running on the Mac during the run. Each tool ran alone. Python tools were timed warm, which favors them. Accuracy is how much of the text a tool got right, compared with LibreOffice's own output for each file. Word is a tie. PowerPoint: Fetlar does not lead. Multipliers are rounded down.
  2. Size of the macOS program. The archive is smaller.
  3. Not supported yet: old .doc and .ppt, password-protected files, and PowerPoint compare.